![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Exterior Photography, Facade](https://images.adsttc.com/media/images/6603/0524/ac59/6f01/7c1d/9cb4/newsletter/footbridge-in-litomysl-ehl-and-koumar-architekti_2.jpg?1711473988)
-
Architects: EHL & KOUMAR ARCHITEKTI
- Year: 2022
-
Photographs:Tomas Soucek, Stavba roku
-
Lead Architects: Lukáš Ehl, Tomáš Koumar, Ladislav Dvořák, Ladislav Šašek
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Exterior Photography, Windows, Arcade, Arch](https://images.adsttc.com/media/images/6603/0525/b093/fa6c/7d08/3fdf/newsletter/footbridge-in-litomysl-ehl-and-koumar-architekti_11.jpg?1711473977)
Text description provided by the architects. The new footbridge with an elevator, which replaces the original overpass from 1981, provides barrier-free pedestrian access from the Municipal Office to the city center and enhances the route across the busy I/35 highway.
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Exterior Photography, Windows](https://images.adsttc.com/media/images/6603/0523/ac59/6f01/7c1d/9cb3/medium_jpg/footbridge-in-litomysl-ehl-and-koumar-architekti_15.jpg?1711474034)
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Exterior Photography](https://images.adsttc.com/media/images/6603/0525/b093/fa3b/b99c/1c42/medium_jpg/footbridge-in-litomysl-ehl-and-koumar-architekti_6.jpg?1711473990)
The subtle steel structure is supported by massive pillars made of exposed concrete. The elevator tower is located on the axis of the original staircase towards the historic center and supports the structure of the bridge. The tower creates a new landmark visible through Ropkova Street from the square.
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Exterior Photography, Windows, Cityscape](https://images.adsttc.com/media/images/6603/0526/b093/fa6c/7d08/3fe0/newsletter/footbridge-in-litomysl-ehl-and-koumar-architekti_1.jpg?1711473997)
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Image 20 of 32](https://images.adsttc.com/media/images/6603/061d/ac59/6f01/7c1d/9ce2/newsletter/floorplan-29.jpg?1711474222)
The central pillar continues into a new concrete staircase oriented to the path to Smetanův dům. On the western approach, the bridge is supported on an abutment in the existing retaining wall.
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Image 12 of 32](https://images.adsttc.com/media/images/6603/0524/ac59/6f01/7c1d/9cb5/medium_jpg/footbridge-in-litomysl-ehl-and-koumar-architekti_16.jpg?1711474024)
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Image 4 of 32](https://images.adsttc.com/media/images/6603/0524/b093/fa6c/7d08/3fdd/medium_jpg/footbridge-in-litomysl-ehl-and-koumar-architekti_3.jpg?1711473989)
The structural system of the welded steel bridge structure is a continuous beam with two spans and cantilevered ends. The bridge's superstructure consists of two main Vierendeel girders connected by transverse beams.
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Image 18 of 32](https://images.adsttc.com/media/images/6603/0525/ac59/6f01/7c1d/9cb7/newsletter/footbridge-in-litomysl-ehl-and-koumar-architekti_9.jpg?1711473990)
By repeating of the cross-section in the longitudinal direction a spatial 3D Vierendeel girder is formed with an orthotropic deck plate and the roof. The spatial module of 3.07 x 3.07 x 3.07 m is repeated in the reinforced concrete structures.
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Image 22 of 32](https://images.adsttc.com/media/images/6603/061c/b093/fa6c/7d08/4034/newsletter/longitudial-section-30.jpg?1711474222)
The precision of the girder edges and the overall geometry was achieved by the use of HEB beams and welded plates in a cross-section of 220 x 220 mm.
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Image 17 of 32](https://images.adsttc.com/media/images/6603/0521/ac59/6f01/7c1d/9cb2/medium_jpg/footbridge-in-litomysl-ehl-and-koumar-architekti_8.jpg?1711473971)
Thanks to the chosen structure, the footbridge protects against bad weather and offers an attractive view between the treetops over the Loučná River. The footbridge has a railing of stainless-steel mesh and a round handle. The lighting enhances the contrast between the lightweight steel structure and the exposed concrete.
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Exterior Photography](https://images.adsttc.com/media/images/6603/0528/ac59/6f01/7c1d/9cbc/newsletter/footbridge-in-litomysl-ehl-and-koumar-architekti_5.jpg?1711474005)
The simple character of the structure is enlivened by the graphics of Ivana Šrámková at the elevator entrances and the rear wall of the elevator tower.
![Footbridge in Litomysl / EHL & KOUMAR ARCHITEKTI - Image 14 of 32](https://images.adsttc.com/media/images/6603/0526/ac59/6f01/7c1d/9cbb/newsletter/footbridge-in-litomysl-ehl-and-koumar-architekti_4.jpg?1711473996)